Report from the Field Spring 2016 – Okmok

USGS collaborator Paul Bedrosian installing an MT site. The induction coils are being laid out in N-S and E-W orientations to orient trenches they will be buried in. Photo credit: K Key

Both comments and trackbacks are currently closed.